Pharmaceutical packaging starts with the formulation
A free-flowing granule, a dusty powder and a viscous oral gel need different feeding and filling arrangements. Begin with the intended use, formulation properties and target dose, then review the pack dimensions, sealing process and handling requirements together.
COTECH manufactures sachet and stick pack machinery in Foshan, China. For a pharmaceutical project, share your user requirement specification and representative samples early. Contact materials, cleaning access, documentation and inspection scope should be agreed for the individual application. Sterile or aseptic processing requires a separate technical assessment.
What to review in pharmaceutical packaging equipment
- Dose consistency. Agree the target quantity, allowable variation, sampling method and test conditions. Evaluate each lane with the actual formulation rather than relying on a generic dosing claim.
- Powder and liquid behavior. Check bulk density, dust, segregation, foaming, viscosity and particles. These affect product transfer, nozzle selection and the risk of contaminating the seal area.
- Cleaning and changeover. Review product-contact parts, dismantling access and cleaning procedures against your contamination-control strategy and product sequence.
- Traceability and inspection. Specify batch coding, code verification, weight checking and reject handling in the equipment brief. Confirm which devices and records are included in the proposed scope.
- Qualification requirements. Discuss the documentation and acceptance evidence your quality team needs before ordering. Equipment alone does not establish product approval or regulatory compliance.
- Sachet packing machines. Flat single-dose packs provide a printable face for identification and instructions. Confirm dose volume, tear opening and seal integrity with the selected laminate.
- Stick pack machines. Narrow packs can be evaluated for powders, granules and oral liquid portions. Product flow and required dose determine the dosing system and practical lane configuration.
- Integrated stick pack lines. Where the project needs counting and secondary handling, define the required count, code checks and carton interface as part of the line specification.
Film selection, testing and installation preparation
Choose a laminate around the formulation's sensitivity to moisture, oxygen and light, plus the required seal and opening properties. Obtain product-contact and barrier information from the film supplier and verify the proposed structure using actual product and a sample roll.
Factory testing should follow an agreed protocol covering fill variation, seal appearance, leakage checks, coding and rejects under defined operating conditions. Product stability and the suitability of the finished pack require the product owner's own evidence.
Before shipment inspection, agree the supplied documents, spare parts, contact-part identification and installation needs. Confirm utilities, room conditions, access and operator training with your production and quality teams.